      Introduction to the Pre-construction Stage of Zhenhai Refining and Chemical Industry

      Date:2016.4.19 Hit:5522

      Under the requirement of first-class fire protection, the construction of 53-meter span can not be carried out without crane and welding on site.

      Special report             more...
      • Application of Membrane Structure in Rail Transit...


        More

      • Application of Thermal Insulation Lining Technology in Membrane Archit...


        More

      • Application of membrane curtain wall...


        More

      • Application of Membrane Roofing...


        More

      • Application of Membrane Structure in Environmental Protection Engineer...


        More

      • Application of Membrane Structure in Sewage Treatment Plant...


        More

      About us

      Hardware strength Organization Development path Company Profile

      Software strength Management idea  Solution Contact us

      China Huaxi Construction

      +021-59198545 dshx@hxmjg99.com www.kenstrees.com Shanghai ICP No. 08009856 Terms of use

      国产欧美在线一区二区三区

      <p id="6t866"></p>
      <acronym id="6t866"><s id="6t866"></s></acronym>
    3. 
      

      1. <p id="6t866"></p>

      2. <pre id="6t866"></pre>